In short
Architects should define the substrate, water exposure, intended purpose, existing coatings, preparation, repairs, sample approval, application responsibilities and inspection records. We recommend specifying a treatment only after confirming that the product is intended for the material and condition, with current technical and safety data sheets referenced.
Define exposure and water path
Describe whether the surface faces wind-driven rain, splashback, ground moisture or another exposure. Include relevant junctions, ledges, parapets, joints, openings and drainage routes. A treatment specification should not leave a contractor to infer whether flowing or ponding water is part of the design condition.
If water enters through cracks, movement joints or defective flashings, define those repairs separately. A penetrating surface treatment does not replace a waterproofing detail or a membrane where the assembly requires one. State the interface between trades and the required order of work.
For the drawing set, label each substrate and identify the transitions between original material and repairs. Provide detail references for junctions that need separate sealing or waterproofing. A general note across an entire façade can obscure differences in exposure or condition.
Check product suitability and limitations
Match the selected product to its stated substrates and problem. For example, SurfaPore C is described for porous concrete, masonry, stone and joints, while SurfaPore FX WB is described for stabilising fragile mineral surfaces. SurfaPore RD is described specifically for rising damp on absorbent inorganic building surfaces.
Confirm the current technical data sheet for preparation, application conditions, restrictions and any project specification needs. Include the requirement to follow the current safety data sheet. Do not carry generic instructions from one product into another system.
Include a requirement to verify substrate readiness before application, with a process to raise non-conforming conditions. State who accepts the sample and how comments are closed. This helps prevent the applicator from proceeding on an assumed surface condition.
Write preparation and sample requirements
Specify what cleaning, coating removal, crack repair, joint work and substrate drying are required before application. State how maturity of new cementitious material will be confirmed where relevant. Identify which party accepts the surface as ready, and how unexpected defects are escalated.
Require a discreet sample on representative material, with agreed review criteria for appearance and coverage of the intended surface. Record the location and approval before bulk work. Where stone, brick or repaired areas vary, consider whether separate samples are needed to represent each condition.
Where the building has existing coatings, require the contractor to identify them before removal. Set out the approval route for the removal method and any trial area. This avoids damaging a substrate or altering a heritage appearance through an unreviewed preparation process.
Set verification and close-out records
Describe how the applicator will document the treated area, product identification, preparation, weather conditions and completion. State what visual inspection can verify and what it cannot. Avoid promising an outcome that the product information or project scope does not support.
Coordinate access, protection of adjacent finishes and any work by other contractors. Ask for a close-out pack containing photographs and the current technical and safety data sheets, then transfer the record to the owner or facilities team for future maintenance planning.
For handover, ask for a marked-up plan showing treated and untreated areas, plus records of repairs and sample decisions. A clear record makes the design intent understandable to the owner and the next maintenance team. Follow the current technical and safety data sheets before application.
Take a specification step this week
Before issuing a tender, confirm the substrate and exposure with the design team and review whether the moisture source has been resolved. Where the proposed treatment is part of a larger waterproofing assembly, coordinate it with the details rather than treating it as an isolated product line.
This week, add a schedule item for substrate verification, preparation, sample approval, product limitations and close-out records. Ask the proposed applicator to flag any mismatch between site conditions and the specified treatment before procurement.
Questions
Should architects name a product before inspecting the substrate?
A product should not be specified without knowing the substrate and project condition. The specification can identify a performance intent, then confirm the selected product against the actual surface, water exposure and preparation needs before application.
What documents should accompany the specification?
Reference the current technical and safety data sheets for the selected product and require the applicator to follow them. Include drawings, surface schedules, sample approval requirements and a record of areas treated where the project needs them.