We help quantity surveyors compare treatment scopes by checking preparation, quantities, repairs and exclusions.

4 min read · Updated 22 November 2026

In short

Quantity surveyors should ask what substrate and area are included, how quantities are measured, what preparation and repairs are excluded, how samples are approved and what records are required. Confirm the selected product and current technical data sheet before comparing prices, so quotations cover a consistent scope.

Define quantities and boundaries

Identify the elevations, rooms, joints or timber areas included and how each quantity will be measured. Record surfaces that are inaccessible, coated, damaged or outside the product scope. Where several materials occur, separate them rather than using one broad area allowance.

Confirm whether returns, reveals, parapets and repaired patches are included. Provide drawings or marked photographs where possible, and require the contractor to identify any site conditions that may change the measured quantity.

Ask whether the price includes a sample and whether the approved sample area is deducted from or added to the measured quantity. Confirm how the applicator will handle extra preparation if the actual surface differs from tender assumptions. Record rates and variation rules clearly.

Clarify preparation and repairs

List cleaning, coating removal, salt removal, crack repair, repointing and other preparation explicitly. State who is responsible for each item and how readiness will be confirmed. Product instructions and substrate conditions determine what preparation is required.

Separate remedial repairs from surface treatment quantities. A penetrating product does not fill cracks or replace defective joints, so keep those tasks visible in the cost plan and avoid assuming they are covered by a general preparation item.

Check whether access, protection, resident liaison and cleanup appear in each bid. These items can materially affect the work plan even when the treatment material is the same. Keep the comparison consistent and request clarification where a proposal is silent.

Compare products and documentation

Check that the selected product description matches the substrate and problem, then reference its current technical data sheet. Do not compare unlike systems as though one litre rate or application method applies to all products. Confirm how the applicator will document product use and treated areas.

Include current safety data sheets and specify that the applicator follows the current technical and safety information. If a product or substrate has limitations, ensure they are reflected in the scope and programme before procurement.

Confirm whether the contractor has allowed for removal of existing coatings and where that material will be found. If coating removal is excluded, include the separate package and coordinate readiness checks before treatment. Do not treat unknown coatings as ordinary cleaning.

Account for samples and site conditions

Include representative sample work, owner review and any agreed appearance criteria. Specify whether the sample area is part of the measured quantity and how approval is recorded. Weather, access and occupied-site requirements may affect sequencing and should be considered in the programme.

Ask how the contractor will handle hidden defects, wet or contaminated surfaces and any change in scope. A clear variation process protects the project from unrecorded work and supports a fair comparison of bids.

For quantities based on drawings, compare the area takeoff with site photographs and confirm the measured boundaries. Record deductions or additions for openings, returns and repairs. Clear measurement rules help the project team assess changes and final account.

When bids include different products, verify whether each bidder has allowed for the same substrate and preparation. Record clarifications in writing and carry accepted assumptions into the contract, so the agreed price and method remain aligned. Follow the current technical and safety data sheets before application.

Use a comparison checklist this week

A concise tender comparison can show the product, substrate, area, preparation, repairs, sample, access, exclusions and close-out records side by side. This makes differences visible before an award and gives the project team a basis for clarifications.

This week, review the proposed scope against the site drawings and ask each bidder the same questions about quantities, repairs and preparation. Confirm the product information and resolve scope gaps before recommending a contractor.

Questions

Can I compare treatment quotations by coverage alone?

No, coverage figures do not make quotations comparable when products, substrates, preparation or application requirements differ. Confirm the current product information and scope, including repairs and access, before comparing costs. We confirm the actual surface and project scope before advising further.

What records should be included in close-out?

Agree on treated-area locations, product identification, preparation and repair records, photographs, and the current technical and safety data sheets. The exact close-out requirements should reflect the project specification and owner needs. We confirm the actual surface and project scope before advising further.